November 22, 2024
2017.09.18mcbuildingcollapse_0

Lagos State Government, on Thursday, is set to deconstruct the three uncompleted high-rise structures on the site of a 21-storey building that collapsed on Gerrard Road, Ikoyi, last November.

The structures have failed integrity tests, prompting the State Government to embark on a controlled deconstruction to bring them down.

A structural engineering firm, Edge of Design, will dismantle the twin 14-storey and eight-storey structures on the site in a manner that will not pose any health or environmental hazards to residents in the neighbourhood.

The deconstruction, which is expected to be completed within 90 days, is to be supervised by relevant agencies of the Government and private stakeholders in the built industry.

The development, it was learnt, is part of the recommendations by a six-man panel that investigated the collapse of the 21-storey structure owned by Messrs Fourscore Heights.

The land on which the failed structures sit has been forfeited to the State Government by law. The panel also recommended criminal prosecution of the developer for contravening the State’s building codes.

No fewer than 45 persons, who were mainly construction workers and vendors, died in the incident. Also, the developer, Mr Femi Osibona, died in the collapsed building.

Representative of the contractor, Edge of Design, Mr. Olujimi Lewu, explained the step-by-step process to be employed in bringing down the structures, that the work would be done without any injury or fatality. He illustrated how the slabs would be removed, until the structures come down.

Commissioner for Information and Strategy Mr. Gbenga Omotoso, at a press briefing held at the Bagauda Kaltho Press Centre in Government Secretariat in Alausa, said safety would be the main consideration in the deconstruction. He said the press conference was in the spirit of transparency for which the Governor Babajide Sanwo-Oku administration is famous.

He stressed that the deconstruction was agreed upon after extensive consultations with stakeholders, residents and regulators in the built industry.

The Commissioner assured residents in the neighbourhood of their safety throughout the exercise, noting that measures had been put in place to ensure that the contractor maintains the agreed safety protocols.

“The deconstruction will be done with one key focus from all stakeholders; this is safety of people in the neighbourhood and everybody that will be working on the site. The recommendations of the panel are being implemented to prevent this kind of incident,” Omotoso said.

Commissioner for Special Duties, Mr. Tayo Bamgbose-Martins, a civil engineer, assured all that reports on the deconstruction would be regularly shared with the public. He described the contractor as competent.

Commissioner for Physical Planning and Urban Development, Dr. Idris Salako, shed light on why the State Government took over the property, saying: “Section 74 of the Urban and Regional Planning and Development Laws of Lagos State 2019 (as amended) prescribes that any property that collapses in the State is automatically forfeited to the Government.”

Salako said the State Government had not decided on what to do with the site after the deconstruction.

He said: “When the State Government is ready to revive the site, we will let the public know what we want to do with it. However, I can assure you that the land will not be given to any individual developer or converted to unapproved use by the Government. The site will be used for something that will be of benefit the public.”

After the press briefing, the Government’s team moved to Ikoyi to hand over the site to the contractor.

 

 

22 thoughts on “Lagos begins deconstruction of three structures on Ikoyi building collapse site

  1. Just desire to say your article is as astonishing.

    The clearness in your post is just cool and
    that i can assume you are a professional in this subject.
    Well along with your permission allow me to grab your RSS feed to keep
    up to date with forthcoming post. Thanks one million and please continue the
    rewarding work.

  2. что если снятся кролики мужчине луна падает в соннике камни обереги от черной магии
    солнце в козероге луна в деве венера в рыбах пусть давно я вижу тебя но глаза
    твои снятся как

  3. руководитель департамента экологии вко, департамент экологии семей клюшка для хоккея взрослая,
    купить клюшку для хоккея в астане ең кішкентай жануар, ең кішкентай балық портниха бай,
    подгонка одежды рядом

  4. шизофрения протокол казакша, шизофрения түрлері презентация статья 52 пункт 2 трудового кодекса рк,
    статья 52 рк әліппеге дейінгі кезең тапсырмаларының
    үлгісін жасау, әліппеге дейінгі кезең сабақ жоспарлары гүлдің жапырағы неге сарғаяды,
    гүлді қалай емдейді

  5. суши деген не казакша, суши қай елдің тағамы приборы для массажа, массажер haday kneading вибрационный воротник бежевый стол на ауызашар, ауызашар на русском болашақ
    біздің қолымызда эссе, болашақ туралы эссе

Leave a Reply

Your email address will not be published. Required fields are marked *